IQ, OQ and PQ are the three stages of equipment qualification. Installation Qualification (IQ) checks the equipment is installed correctly, Operational Qualification (OQ) checks it works as specified across its range, and Performance Qualification (PQ) checks it performs consistently with your real loads and processes.
The three stages
| Stage | What is checked | Example for a stability chamber |
|---|---|---|
| IQ | Delivery, components, utilities, documents, calibration certificates | Model and serial match, power supply, sensors calibrated, manuals received |
| OQ | Controls, alarms, ranges and uniformity without load | Temperature and RH mapping at set points, alarm and power-failure tests |
| PQ | Consistent performance with real loads over time | Mapping with loaded shelves over the qualification period |
Which equipment needs qualification?
Any equipment whose results affect product quality or regulatory data, such as a stability test chamber, autoclave, hot air oven, BOD incubator, biosafety cabinet or ULT freezer.
Before IQ: design qualification
Many labs also prepare a Design Qualification (DQ) or user requirement specification before purchase. It lists the capacity, range, accuracy, alarms and documentation you need, so the supplier can confirm the equipment meets them.
When to requalify
Requalify after major repairs, relocation or controller changes, and at the interval set in your validation plan, often yearly for critical equipment.
Frequently Asked Questions
Who performs IQ OQ PQ?
The supplier usually supports IQ and OQ with protocols and test data, while the user is responsible for approving them and performing PQ with real loads.
Is temperature mapping part of OQ or PQ?
Empty-chamber mapping is normally part of OQ, while mapping with a typical load is part of PQ.
Does Yatherm provide IQ OQ documentation?
Contact our team with your equipment and requirement and we will share the documentation and support available.
Talk to our team about qualification support for your equipment.
