Over Five Million Products Sold till Now
info@yatherm.com Mon - Sat 10:00 - 19:00
Yatherm Knowledge Hub

IQ OQ PQ for Laboratory Equipment Explained

25 Nov, 2026
Admin User
2 min read
5M+ ProductsSold till date
Lab & IndustryTrusted equipment
Pan IndiaDelivery & support
FreeExpert consultation
In short We are manufacturer of Magnetic stirrer & Multiposition Magnetic stirrer with hot Plate in India. Call & Mail us for magnetic stirrer Prices

IQ, OQ and PQ are the three stages of equipment qualification. Installation Qualification (IQ) checks the equipment is installed correctly, Operational Qualification (OQ) checks it works as specified across its range, and Performance Qualification (PQ) checks it performs consistently with your real loads and processes.

The three stages

StageWhat is checkedExample for a stability chamber
IQDelivery, components, utilities, documents, calibration certificatesModel and serial match, power supply, sensors calibrated, manuals received
OQControls, alarms, ranges and uniformity without loadTemperature and RH mapping at set points, alarm and power-failure tests
PQConsistent performance with real loads over timeMapping with loaded shelves over the qualification period

Which equipment needs qualification?

Any equipment whose results affect product quality or regulatory data, such as a stability test chamber, autoclave, hot air oven, BOD incubator, biosafety cabinet or ULT freezer.

Before IQ: design qualification

Many labs also prepare a Design Qualification (DQ) or user requirement specification before purchase. It lists the capacity, range, accuracy, alarms and documentation you need, so the supplier can confirm the equipment meets them.

When to requalify

Requalify after major repairs, relocation or controller changes, and at the interval set in your validation plan, often yearly for critical equipment.

Frequently Asked Questions

Who performs IQ OQ PQ?

The supplier usually supports IQ and OQ with protocols and test data, while the user is responsible for approving them and performing PQ with real loads.

Is temperature mapping part of OQ or PQ?

Empty-chamber mapping is normally part of OQ, while mapping with a typical load is part of PQ.

Does Yatherm provide IQ OQ documentation?

Contact our team with your equipment and requirement and we will share the documentation and support available.

Talk to our team about qualification support for your equipment.

#iq oq pq #equipment qualification #validation #laboratory equipment
Share:
A

Admin User

Yatherm Scientific manufactures and supplies laboratory, pharmaceutical, and industrial testing equipment. Our team writes these guides to help you choose and use the right instrument with confidence.

Keep Reading

You May Also Like

Looking for laboratory equipment?

Tell us your application and capacity. Our engineers will recommend the right model and send a quotation.